Manajemen Strategi dalam Mempercepat Pelaksanaan Proyek Konstruksi pada Pt XY di Makassar

  • Murbayani Murbayani Universitas Patria Artha
    (ID)

Abstract

This study aims to determine the right strategy used by PT. XY to accelerate the implementation of construction projects in Makassar City. The population study is all parties concerned with PT. XY, consisting of the Department of Public Works, the company associates, Planning Consultant, Supervisor, and employees of PT. XY own. The research sample determined by purposive sampling that establishes a sample on the basis that the respondents to determine the condition of the implementation of construction projects undertaken by PT. XY. Analyzer used in this research is using SWOT analysis (Strength, Weakness, Opportunity and Threat). The using of this analysis is a combination of external factors (opportunities and threats) and internal factors (strengths and weaknesses). Based on the analysis, it is known that through the preparation of a SWOT diagram obtained that position PT. XY in an effort to expedite the completion of the construction project, located in quadrant I (first). This means that in an effort to accelerate the completion of construction projects, PT. XY has some internal factors such as the strength of openness in management, adequate manpower skills, commitment of human resources is high, the motivation of the project team, the availability of sufficient infrastructure and refresentatif, and opportunities such as regulation or regulations governing the operation of services construction, the method (CPM and PERT) that can be used to create a network of shorter, the monitoring and evaluation of the Department of Public Works, the existence of a third party who is willing to supply the material, and the presence of the Bank is willing to lend funds. Therefore we need a strategy that can harness the power of PT. XY to seize opportunities (Strenght Opportunity Strategy) or aggressive strategies, such as using CPM or PERT critical time in the planning and allocation of resources.

References

A.A. Gde Agung Yana. 2011. Tahapan-Tahapan Dalam Proyek Konstruksi, diakses dari: http://staff.unud.ac.id/~agungyana

Amstrong. 2003. Sistem Pengendalian Manajemen, Cetakan Ketiga, Terjemahan, Erlangga, Jakarta.

Anonim. 2011. Manajemen Proyek, diakses dari: http://manajemenproyek indonesia.com

Budisuanda. 2011. Faktor Penyebab Keterlambatan Proyek, diakses dari: http://manajemenproyek indonesia.com

Davis, Keith & Newstron, J.W. 2006. Perilaku dalam Organisasi , Erlangga, Jakarta.

Dessler, Gary, 2003 Manajemen Sumber Daya Manusia, PT Prehallindo, Jakarta.

Flippo, Edwin, B. 2002. Manajemen Sumber Daya Manusia, Edisi Pertama, Penerbit Sancaka, Surabaya.

Gibson,. 2004. Organisasi dan Manajemen, Edisi Keempat, Erlangga, Jakarta

Gibson, Invancecic, Donnelly. 2005. Organisasi, Perilaku, Struktur, Proses, Erlangga, Jakarta.

Gomes, Faustiono, 2001, Manajemen Sumber Daya Manusia, Penerbit Andi Offset, Yogyakarta

Handoko. H. 2005. Manajemen, BPFE, Yogyakarta.

Hasibuan S.P., Malayu. 2002. Manajemen Dasar, Pengertian dan Masalah, Edisi Pertama, Gunung Agung, Jakarta.

Jatmiko. 2003. Manajemen Stratejik, Penerbitan Universitas Muhammdiyah, Malang

Pramono, Aswin Rachmat. 2010. Permasalahan Manajemen Proyek dengan Waktu Penyelesaian Aktivitas Tidak Tentu, Tesis, ITS, Semarang.

Rangkuti, F. 2003. Analisis SWOT Teknik Membedah Kasus Bisnis, Cetakan Kesepuluh, PT Gramedia Pustaka Utama, Jakarta.

Salusu, J. 2006. Pengambilan Keputusan Strategik untuk Organisasi Publik dan Organisasi Nonprofit, Cetakan kedua, PT Gramedia, Jakarta.

Sarwoto. 1985. Dasar-Dasar Organisasi Management, Ghalia Indonesia, Jakarta.

Simamora, Henry. 2007. Manajemen Sumber Daya Manusia, STIE YKPN, Yogyakarta.

Siswanto Sastrohadiwiryo, B. 2007. Pengantar Manajemen, Bumi Aksara, Jakarta

Soeharto. 2002. Manajemen Proyek : Dari Konseptual Sampai Operasional, CV. Alfabeta, Bandung

Stoner, James A,F. 2005. Management, Edisi II, Alih Bahasa Alfonsus Sirait, Jakarta, Erlangga.

Sudarto. 2007. Identifikasi Permasalahan Pada Faktor Internal Yang Mempengaruhi Kinerja Perusahaan Jasa Konstruksi Di Indonesia, JURNAL TEKNOLOGI, Edisi No. 2. :102-110.

Sugiyono. 2007. Metode Penelitian Bisinis, Penerbit CV. Alfabeta, Bandung

Tansil, Lucia. 2004. Suatu Analisis SWOT tentang Kebijakan Penataan Kawasan Pemukiman di Kotamadya Makassar, Jurnal Ilmiah, Prospek, Kopertis Wil. IX: 91-94.

Published
2015-08-11
How to Cite
Murbayani, M. (2015). Manajemen Strategi dalam Mempercepat Pelaksanaan Proyek Konstruksi pada Pt XY di Makassar. Assets : Jurnal Ekonomi, Manajemen Dan Akuntansi, 5(1), 99-104. https://doi.org/10.24252/.v5i1.1167
Abstract viewed = 1305 times